حقوق تجارت بین الملل:International Trade Law

بسم الله الرحمن الرحیم- با حقوق تجارت بین الملل بیشتر اشنا می شویم.

حقوق تجارت بین الملل:International Trade Law

بسم الله الرحمن الرحیم- با حقوق تجارت بین الملل بیشتر اشنا می شویم.

مقالات

Dissenting Opinion of Professor Francisco Orrego Vicuña
I very much regret not to be able to join the majority decision of the Tribunal on the
matter of admissibility of an ancillary claim as I do not share the conclusions of that
decision nor the reasoning that led to it. The fundamental factual issue that needs to be
taken into account is that the investment dispute brought before this Tribunal, irrespective
of jurisdictional questions pending, arises from a single business decision by the Claimant
so as to supply the Republic of Georgia with the gas that country needed. As noted in the
decision, the mounting unpaid bills for this supply were the triggering factor of the dispute.
In this context both the Sistema repayment agreements and the Azot purchase were
conceived as mechanisms to resolve the same underlying question, namely they were the
ways found and agreed to make the Claimant whole for the monies owed. It would be
hardly conceivable that an experienced investor would have undertaken the Azot purchase
as a separate business in the circumstances. The record is also sufficiently clear that there
was a link between the several components of the agreements reached. This, in the view of
the dissenting arbitrator, would have justified the admissibility of those various components
in terms of one being ancillary to the other.
The dissenting arbitrator also believes that the applicable law and the case law
justify accepting the ancillary nature of the Sistema claims in the instant dispute. The
requirements of Article 46 of the Convention are met in this case to the extent that the
Tribunal shall “determine any incidental or additional claims or counterclaims arising
directly out of the subject-matter of the dispute provided that they are within the scope of
consent of the parties and are otherwise within the jurisdiction of the Centre”.
The subject-matter of the dispute is not just the alleged wrongful acts concerning the
Azot purchase but the alleged aggregate wrongful acts that affect the investment operation
as a whole, including its various components. To the extent that these operations meet the
jurisdictional requirements of the Convention and are within the consent given by the
parties in the applicable treaties and contracts, there is no reason to exclude any of its
individual components from being accepted by the Tribunal as ancillary claims.
It must also be noted in this respect that the dispute as a whole was duly notified to
the President of Georgia by means of the Claimants’ letter of April 18, 2008, just as it was
explained in the Request for Arbitration of May 7, 2008 and the Memorial submitted on
April 15, 2009.
The fact that no detailed claims concerning the Sistema dispute were brought at the
outset in this arbitration, or that the letter referred to above expressed consent in respect of
the Azot claim in particular, cannot be taken to mean that there was a kind of waiver of the
right concerning their future submission, a right which was moreover expressly
2
safeguarded. The requirement that an ancillary claim be submitted not later than in the
Reply, as noted in Arbitration Rule 40, has been amply satisfied in this case.
The case law concerning the interpretation and implementation of Article 46 of the
Convention in specific instances of ancillary claims, as expressed in Enron, CMS and
LG&E, has been consistent in understanding that claims arise directly out of the same
subject-matter of the dispute when, as noted in the Explanatory Notes to the ICSID
Arbitration Rules with respect to Arbitration Rule 40, the “factual connection between the
original and the ancillary claim is so close as to require the adjudication of the latter in
order to achieve the final settlement of the dispute...”.
The situation is not different here. Just like in those cases, the factual connection in
this case between two concurrent arrangements directed to reach the same objective of
making the Claimant whole for the monies owed, is close enough as to require their
simultaneous adjudication so that settlement of the dispute will be final. Otherwise, the
dispute will continue in so far the remaining claim has not been settled. The facts do not
need to be identical in one and the other dispute. It suffices that they both concern the same
business operation, the same investor and the same State party.
The last point with which this dissent is concerned is the question of procedural
effectiveness. This has been at all times the reason behind the rule on ancillary claims,
which seeks to avoid the unnecessary multiplication and duplication of proceedings. Unless
the rules governing ancillary claims are applied with this objective in mind, the result might
be that every single aspect of a dispute will need to be submitted to separate arbitrations.
The dissenting arbitrator believes that this objective would be better served by
admitting the ancillary claims in the instant case. The Claimants have requested
consolidation of the two ongoing arbitrations, but this proved not to be acceptable to the
Respondent. Many other alternatives have been put into effect so as to achieve the same
goal. In Sempra, Camuzzi and other cases, parallel proceedings were conducted with
consolidated memorials and the same tribunal, following for the most a joint procedural
schedule so as to avoid unnecessary duplication and costs.
On the basis of the views explained above, this arbitrator must respectfully dissent
from the decision taken by the majority of the Tribunal.
[SIGNED]
Francisco Orrego Vicuña
November 30, 2009

نظرات 0 + ارسال نظر
برای نمایش آواتار خود در این وبلاگ در سایت Gravatar.com ثبت نام کنید. (راهنما)
ایمیل شما بعد از ثبت نمایش داده نخواهد شد